TL;DR
- Any plumbing work in a Miranda apartment that touches waterproofing, shared pipes, or common property needs owners corporation approval before work starts — not after.
- The approval tier (cosmetic, minor, or major) determines how long the process takes and what paperwork you need. Most bathroom and kitchen renovations land in the major category.
- Get a licensed plumber to assess the existing pipework before you finalise your layout. What’s behind the walls in older Miranda unit blocks often changes the plan.
- Working hours, lift protection, water shut-off windows, and noise restrictions are strata logistics your plumber needs to know about before quoting.
- The compliance certificate for plumbing and gas work is not optional — you’ll need it for the owners corporation and for any future sale.
Why apartment renovations in Miranda need a different approach
Miranda has a solid mix of older brick unit blocks built in the 1970s and 1980s, medium-density walk-ups closer to the Westfield precinct, and newer apartment buildings that have gone up as the suburb has grown. The plumbing picture across those building types varies a lot. So does the strata governance.
A freestanding house renovation is between you, your builder, and council. An apartment renovation adds a third layer: the owners corporation, its by-laws, and the shared infrastructure that your plumbing work might touch. Get that layer wrong and you can find yourself ordered to undo completed work at your own cost.
The questions below are the ones worth answering before a tile is lifted or a pipe is touched.
Question 1: What approval tier does your renovation actually fall into?
NSW strata law under the Strata Schemes Management Act 2015 splits renovation work into three tiers, and the tier determines how much approval you need and how long it takes to get.
Cosmetic work covers things like repainting walls, replacing a showerhead, or swapping out a vanity without touching the plumbing connections. No owners corporation approval is needed, though giving your strata manager a heads-up is good practice.
Minor renovations (Section 110) go beyond cosmetic changes but don’t touch waterproofing, structural elements, or common property in a way that requires a registered by-law. Under Section 110, minor renovations require approval by ordinary resolution at a general meeting, meaning more than 50% of votes cast in favour. Renovating a kitchen without changing the waterproofing or moving plumbing can fall here, but it’s worth checking your specific scheme’s by-laws first.
Major renovations (Sections 108 and 111) are where most bathroom and kitchen plumbing jobs land. In a strata building, the waterproofing under your bathroom floor is common property, so the moment you strip a bathroom back and re-waterproof it, you are doing major work. Major work needs a special resolution at a general meeting, which passes only if no more than 25% of the votes cast are against it, plus a by-law registered against the title.
The practical consequence: a full bathroom renovation in a Miranda apartment could take months to get approved if the owners corporation only meets quarterly. Start the process early.
Question 2: Does your renovation touch common property pipes?
This is the question that catches people out most often. In a strata building, the pipes inside your walls are not always yours.
The general rule is that pipework serving only your lot — the supply lines from the isolation valve into your kitchen or bathroom, for example — is your responsibility. Pipework that serves more than one lot, or that runs through common property walls and slabs, belongs to the owners corporation.
Running new plumbing or electrical through common property walls or ceilings requires a by-law. If your renovation involves rerouting a drain through a shared wall or connecting to a riser that serves other apartments, you’re dealing with common property. That changes both the approval process and who is responsible for maintenance of the new work going forward.
Before you finalise any layout changes — moving a sink, relocating a toilet, adding a second bathroom — get a licensed plumber to assess where the existing drain and supply lines run and whether the proposed changes cross into common property. This is not something to guess at from a floor plan.
Question 3: What does your strata scheme’s by-law actually say?
The Strata Schemes Management Act sets the framework, but your building’s registered by-laws fill in the detail. Some schemes have by-laws that delegate minor renovation approvals to the strata committee, which can speed things up. Others require every renovation to go to a general meeting regardless of scope.
If a strata scheme does not have a by-law delegating authority to the committee, approval for minor renovations must be sought through an ordinary resolution at a general meeting of the owners corporation. And for major work, work involving waterproofing, structural changes or alterations to common property requires a special resolution of the owners corporation — approval cannot be delegated to the strata committee or given informally by the strata manager.
Get a copy of your scheme’s registered by-laws from your strata manager before you engage any trades. What you’re allowed to do, and how fast you can get approval to do it, depends on what those by-laws say.
Question 4: What does the strata committee actually need to see in your application?
Showing up to a strata meeting with a rough description of what you want to do is not enough for a plumbing renovation. Committees see this regularly and it slows everything down.
A solid application for a renovation involving plumbing typically needs:
- A detailed scope of works covering demolition, plumbing changes, waterproofing, tiling, and any penetrations through walls or slabs
- Plans showing the proposed layout and how it compares to the existing layout
- Licence and insurance details for every trade involved, including the plumber
- Details of working hours, water shut-off arrangements, waste removal, and how common areas like lifts and corridors will be protected
- For major work, a draft by-law setting out the alteration and who is responsible for maintaining the new work
- Waterproofing details and confirmation that the work will meet AS 3740
Strata committees often require professional installation certificates, evidence of appropriate insurance coverage, compliance with acoustic standards particularly for hard flooring, use of materials that match existing building standards, and regular progress updates for complex works.
Your plumber can help with the scope of works section and the licence and insurance details. Pull that information together before you submit.
Question 5: What’s actually behind the walls in your Miranda apartment?
Older unit blocks in Miranda — particularly the brick walk-ups built in the 1970s and 1980s — can carry original copper supply lines and cast iron or early PVC drainage. Both can be in reasonable condition or well past their useful life, depending on how the building has been maintained and what the water chemistry has done to them over the decades.
Opening up a bathroom or kitchen without knowing what’s there is a fast way to add cost and time to a renovation. A pipe that looks fine from the outside can be heavily corroded internally. A drain run that’s supposed to be at a certain gradient can turn out to be nearly flat, which changes what you can do with the layout.
A CCTV drain inspection before demolition starts gives you a clear picture of the drain condition and confirms whether the existing run can support the new layout. For supply lines, a plumber can assess the pipe material and condition during the initial site visit. Either way, you want to know before the walls close up — not after.
If you’re dealing with recurring drainage problems in your apartment and want to understand what’s causing them before you renovate, the guide on common apartment plumbing problems in Sydney high-rises covers the shared-stack and pressure issues that show up across multi-storey buildings.
Question 6: What are the strata logistics your plumber needs to know?
Plumbing work in an apartment building is not the same as plumbing work in a house. There are building-specific constraints that affect how the job runs and how long it takes, and your plumber needs to know about them before quoting.
The main ones to confirm with your strata manager:
- Permitted working hours. Most strata schemes restrict noisy work to business hours on weekdays, and some exclude Saturdays entirely. Confirm the hours before you book.
- Water shut-off windows. Turning off the water to your apartment often requires isolating a riser that serves other units. The building may require notice to neighbours and a set window for shut-offs — sometimes only during off-peak hours.
- Lift and common area protection. Materials coming in and waste going out move through shared spaces. Many schemes require protective padding in lifts and corridors, and some require a bond or damage deposit before work begins.
- Waste disposal. Skip bins on common property or in the car park may need separate approval. Confirm the process before the demolition phase.
- Noise notification. Even if work is within permitted hours, giving neighbours written notice is good practice and some by-laws require it.
A plumber who has worked in strata buildings before will know to ask about these things. One who hasn’t may not factor them into the job schedule, which leads to delays and friction with the committee.
Question 7: Is there a gas line in the renovation zone?
Miranda apartments with gas cooking or gas hot water have supply lines running through the building. If your renovation touches the kitchen or a laundry with a gas connection, the gas work needs to be done by a licensed gas fitter — not a general plumber unless they hold both licences.
The gas riser and any shared supply pipework serving multiple apartments is generally common property, managed by the owners corporation. A fault here is a strata matter, not something an individual owner arranges directly. Work on the individual connection point within your lot is your responsibility, but anything touching the riser or shared infrastructure goes back to the owners corporation.
Any gas work carried out during the renovation requires a Certificate of Compliance from the licensed gas fitter. This is not optional — you’ll need it to satisfy the owners corporation and for any future property sale or lease. See our gas fitting service page for what that work involves.
Question 8: What compliance documents will you need at the end?
When the renovation is complete, you’ll need documentation that confirms the plumbing and gas work was done properly. The owners corporation may ask for this before they sign off, and you’ll want it on file regardless.
The key documents for a plumbing renovation in NSW are:
- Certificate of Compliance (plumbing). Issued by the licensed plumber for any regulated plumbing work. Required under NSW law.
- Certificate of Compliance (gas). Issued by the licensed gas fitter for any gas work. Separate from the plumbing certificate.
- Waterproofing compliance. Confirmation that waterproofing meets AS 3740. Some strata schemes require this to be signed off by an independent certifier.
- The registered by-law (for major work). This needs to be lodged with NSW Land Registry Services within six months of the special resolution passing.
Renovating without approval can lead to NCAT orders to remove works, restore common property, and pay costs. Keeping the paperwork in order protects you from that outcome and makes any future sale or dispute significantly simpler.
Getting the plumbing sorted before the renovation starts
The pattern behind most delayed or over-budget apartment renovations is the same: trades are booked, materials are ordered, and then a plumbing or strata issue surfaces that nobody planned for. A water shut-off window that’s only available on Tuesday mornings. A drain run that’s too flat to support the new layout. A pipe that needs replacing before the new bathroom can go in.
A site visit from a licensed plumber before you finalise the design and submit the strata application catches most of these things. It also gives you the scope of works detail that the owners corporation needs to see.
If you’re planning a bathroom, kitchen, or laundry renovation in a Miranda apartment and want a plumber who can assess the existing setup and give you a clear picture of what the job involves, call us on 02 5950 5382 or book a CCTV drain inspection to start with the drain condition. We work across Miranda and the Sutherland Shire, we’re familiar with strata jobs, and we give you a fixed price before any work starts.