TL;DR
- Gas hot water installation in NSW must be done by a licensed plumber who also holds a gas fitting endorsement — one person, two licences.
- A straightforward like-for-like replacement typically takes 2 to 4 hours. Moving the unit or running new gas pipe adds time.
- The plumber will check gas pressure, connect water and gas lines, fit a tempering valve, pressure-test the system, and commission it before handing over.
- You’ll receive a Certificate of Compliance for the gas work. Keep it — you’ll need it for insurance and if you ever sell.
- If your home has no gas connection yet, a new meter through Jemena adds weeks to the timeline. Plan ahead.
Before anyone touches a thing: the licence question
Gas hot water is not a job for a general plumber alone. In NSW, the gas connection side of the work legally requires a licensed gas fitter — someone who holds a plumbing licence and a separate gas fitting endorsement. A plumber without that endorsement can fit the tank, but cannot legally touch the gas line.
When you book, ask for the licence number and check it on the NSW Fair Trading licence register. It takes about 60 seconds and tells you whether the person is licensed for gas work. Our licence is 488187C if you want to see what a valid result looks like.
If you’re still working out whether gas is the right system for your home, the guide to choosing an instant gas hot water system covers sizing, fuel type, and indoor vs outdoor placement before you commit.
What the plumber checks before the install starts
A good gas plumber doesn’t arrive and immediately start disconnecting things. The first ten to fifteen minutes are a site assessment. Here’s what that covers:
- Gas supply pressure at the meter. The existing pressure has to be adequate for the new unit — especially critical for continuous flow systems, which need a strong, consistent supply. Undersizing here leads to temperature drops when two taps run at once.
- Location suitability. Gas units installed indoors must be properly flued to expel combustion gases outside. Outdoor units need adequate clearance from windows, doors, and boundary walls under AS/NZS 5601 (the Australian standard for gas installations).
- Existing pipe condition. If the gas or water pipework feeding the old unit is corroded, undersized, or non-compliant, the plumber will flag it before starting. Better to know now than mid-job.
- Access. Can the old unit be removed without removing fencing, gates, or laundry cabinetry? Access issues don’t make the job impossible, but they add time.
This is also when the plumber confirms the unit is the right size for your household. If there’s a mismatch between what was ordered and what the site needs, it’s far better to resolve it at this stage.
Step by step: what happens during the installation
Step 1: Isolate and remove the old unit
The gas supply to the existing unit is isolated at the nearest isolation valve. The water supply is shut off. The old unit is drained — storage tanks hold anywhere from 135 to 315 litres, so this takes a few minutes. Once drained, the gas and water connections are disconnected and the old unit is removed from its position.
If the old unit is a storage tank, it’ll need to be carried out. In tight spaces — side passages, small courtyards, laundry cupboards — this is where access issues show up. Expect a few extra minutes if the space is awkward.
Step 2: Position and secure the new unit
For a continuous flow (instant) system, the unit is wall-mounted. The plumber checks that the mounting surface is structurally sound and that the positioning meets clearance requirements from the standard. For a storage tank, the unit is positioned on a level base — either an existing concrete pad or a new one if the old base is unsuitable.
Step 3: Connect the water lines
Cold water in, hot water out. The plumber connects both lines, typically using copper or flexible connectors. A tempering valve is fitted on the hot water outlet — this is a legal requirement under NSW regulations for any new or replaced hot water system. It caps the water temperature at fixtures to 50°C, which prevents scalding at the tap while the tank itself stays at 60°C to prevent legionella growth.
An expansion control valve and a pressure relief valve are also fitted if not already present. These are compliance parts — not optional extras.
Step 4: Connect the gas line
This is the licensed gas fitting part of the job. The plumber connects the unit to the existing gas supply, using the correct fittings and pipe sizing for the unit’s gas consumption rate. Continuous flow units draw more gas than storage systems, so the supply line has to be sized to match.
For a like-for-like swap in the same location, this is usually straightforward. If the unit is moving to a new position, new gas pipe has to be run — which adds time and cost.
Step 5: Flue installation (storage systems and some indoor continuous flow units)
Gas storage systems and some indoor continuous flow units require a flue to vent combustion gases outside. The plumber fits or reconnects the flue, making sure it terminates in the correct location and isn’t obstructed. Outdoor continuous flow units are typically flue-free — combustion gases disperse directly into the open air.
Step 6: Pressure testing and gas tightness check
Before the gas is turned on, the plumber pressure-tests the new connections to confirm there are no leaks. This is not optional — it’s a mandatory step under the Australian standard. The test checks gas tightness across every joint in the work performed. If anything fails, it’s fixed before commissioning begins.
Step 7: Commission and test the system
Gas on. The plumber lights the unit, checks the burner performance, verifies the flame quality, and confirms the operating pressure at the appliance under load. For a storage system, the tank begins heating — it won’t reach temperature for an hour or two. For a continuous flow system, hot water is available almost immediately once the unit is running.
The plumber will also set or verify the temperature controller and walk you through the basic controls before leaving.
How long does a gas hot water installation take?
For a straightforward replacement in the same location with gas already connected, the job typically takes 2 to 4 hours for a continuous flow unit and 3 to 5 hours for a storage tank. The extra time on storage systems comes from draining the old tank and waiting for the new one to be filled and pressure-checked.
The timeline stretches when:
- The unit is moving to a new location (new gas pipe and water lines need to be run)
- The existing gas pipework needs upgrading to handle the new unit’s demand
- Access is difficult — tight side passages, laundry cupboards, or elevated positions
- The flue needs rerouting or a new penetration through a wall or roof
- There’s no gas connection at the property yet
That last point is worth flagging separately. If your home has no gas meter, a new connection through Jemena (Sydney’s gas distributor) typically has a lead time of several weeks. The plumber can help initiate the application, but the timeline is set by Jemena, not by the plumber. If your current system is ageing and you’re planning to switch to gas, start the process before it fails.
What you get at the end: the Certificate of Compliance
Once the job is done, the licensed gas fitter issues a Certificate of Compliance for the gas fitting work. This document confirms the installation was carried out by a licensed tradesperson and meets the required standards.
Keep it somewhere safe. You’ll need it if you ever make an insurance claim involving the hot water system, and it will be required when you sell the property. In NSW, a Certificate of Compliance must be issued for any new gas installation or alteration — it’s not something a plumber can skip or provide later.
What to sort before the plumber arrives
A bit of preparation on your end keeps the job moving:
- Clear the area around the existing unit. Give the plumber room to work and to remove the old unit without moving your stuff first.
- Know where your main water shut-off is. The plumber will isolate the supply to the unit, but if something unexpected happens, you want to be able to shut off the mains quickly.
- Have the new unit on site if you’ve supplied it. If the plumber is supplying the unit, this isn’t your concern — but if you’ve purchased it separately, confirm it’s there and accessible before the booking.
- Tell us about access issues when you book. Side gate locked, unit in a laundry cupboard, steep driveway — mention it upfront so the plumber arrives prepared.
- Plan for 2 to 4 hours without hot water. For most jobs this is the realistic window. Storage systems take longer to reheat after installation, so plan around that if you have kids or early morning commitments.
The jobs where gas hot water installation gets more complicated
Switching from electric to gas
If you’re moving from an electric system to gas, the scope expands. You’ll need a gas line run to the new unit’s location, and a flue fitted if it’s going indoors. If there’s no gas meter at the property, add the Jemena connection timeline. The electric system also needs to be properly decommissioned. This is a bigger job than a like-for-like gas swap — factor that into your planning and your quote.
Apartments and strata buildings
Gas hot water in apartments adds a strata layer. If the unit serves only your apartment, it’s likely your responsibility — but confirm the strata plan first. Work in common areas, or work that affects shared pipes or gas risers, typically requires strata approval before anything starts. Check with your strata manager before booking.
LPG systems
If your home runs on LPG rather than natural gas, the installation process is similar but the unit must be configured for LPG — it’s not interchangeable with a natural gas unit. Make sure the plumber knows which fuel type you’re on before they source the unit.
Signs the installation was done properly
You shouldn’t have to guess. A well-done gas hot water installation leaves you with:
- A Certificate of Compliance in hand before the plumber leaves
- Hot water running at the correct temperature (around 50°C at the tap)
- No smell of gas anywhere near the unit or connections
- A clean work area — old unit removed, no debris left behind
- A clear explanation of the temperature controls and what to do if something goes wrong
If the plumber leaves without providing the certificate, ask for it. It’s a legal requirement, not a courtesy.
For more on what gas fitting work involves in a Sydney home, the gas fitting explainer covers the full scope of what a licensed gas fitter can and can’t do. And if you’re unsure whether you need a plumber, a gas fitter, or both for your job, this guide on NSW gas fitting licences explains the difference in plain terms.
Ready to get it sorted?
If your gas hot water system has failed, or you’re planning a replacement before it does, call us and tell us what you’ve got. We’ll confirm the right unit for your home, give you a fixed price before we start, and handle the gas fitting and plumbing in one visit. NSW licence 488187C.