TL;DR
- Adding a laundry to an apartment is a plumbing job first and a strata approval job second. You need both sorted before any work starts.
- Strata consent is almost always required when the work involves new plumbing, drainage, or waterproofing. In many buildings, this means a formal application and a general meeting resolution.
- The plumbing scope includes a cold water supply connection, a drain connection, a floor waste, and compliant waterproofing. If you want hot water at the tub, that adds another connection.
- All plumbing work in NSW must be done by a licensed plumber. Waterproofing in a wet area is also licensed trade work.
- Get strata approval before you book a plumber. Skipping the order wastes time and money.
Why apartments make this harder than a house
In a house, adding a laundry is mostly a plumbing question. You find a sensible location near existing pipes, run the connections, sort the drainage, and you’re done. In an apartment, you’re dealing with two separate problems at once: the plumbing itself, and the strata layer that sits on top of it.
Shared buildings have shared consequences. A leak from a new laundry on level four doesn’t just damage your apartment — it can travel through the slab and into the apartment below. That’s why strata schemes treat new wet area work seriously, and why the approval process exists in the first place.
The good news is that adding a laundry is absolutely doable in most apartments. You just need to go in the right order.
Step one: understand what strata approval you actually need
Before you call a plumber, call your strata manager.
Under NSW strata laws, laundry renovations fall into either minor works or major works, and the category decides how the approval works. Adding a laundry where none existed before — with new plumbing, new drainage, and new waterproofing — is almost always treated as major works.
If your renovation impacts common property or involves structural modifications, Owners Corporation approval is required at a General Meeting, unless your building has a by-law allowing the Strata Committee to review and approve the request instead.
The process typically involves submitting a renovation application to the strata manager, including a scope of work, trade licences, and insurance certificates. Some schemes also require a by-law to be registered before work proceeds.
Once your renovation proposal is submitted and approved, most strata schemes require at least 14 days’ notice before works commence. That timeline varies, so check your building’s specific by-laws rather than assuming.
One practical tip: engaging the strata manager early, before finalising the scope or booking trades, avoids delays and ensures the renovation proceeds within the scheme’s rules.
What a strong strata application includes
A vague application gets knocked back or sits in a queue. A thorough one moves faster. When you submit, include:
- A clear scope of works — what plumbing is being added, where, and why
- A simple plan showing the proposed location relative to existing pipe runs
- Your plumber’s licence number and public liability insurance details
- Waterproofing details, including the standard the membrane will meet
- Proposed work hours (most buildings restrict trades to weekdays during business hours)
- A note on how the work area will be protected and cleaned up
For major renovations, plans, engineering reports, and compliance certificates from licensed professionals may be required. Your strata manager can tell you exactly what the scheme needs before you put the application together.
The plumbing work involved, broken down
Once you have strata approval, the plumbing scope for a new apartment laundry typically covers four things.
1. Cold water supply connection
Your washing machine needs a cold water tap. The plumber will run a supply line from the nearest accessible pipe — usually in a bathroom, kitchen, or existing laundry cupboard — to the new laundry location. The closer the new laundry is to existing plumbing, the simpler and cheaper this connection is. Running supply lines through walls or across a long distance adds time and cost.
2. Drain connection
Washing machines produce a lot of waste water quickly. The drain connection needs to tie into your building’s drainage stack or an existing branch drain, at the right fall, and in the right location. This is where apartment plumbing gets more constrained than a house. You can’t always drain wherever you want — the stack location largely determines where a laundry can practically go. Your plumber will assess this before committing to a location.
3. Floor waste
A floor waste (floor drain) is standard in a laundry wet area. It catches overflow from the machine and from the tub, and it’s part of meeting the waterproofing requirements for the space. The floor waste needs to be positioned correctly relative to the floor fall — water has to drain toward it, not pool away from it.
4. Waterproofing
This is the step that protects the apartment below you. Waterproofing is critical in apartment renovations because water damage can affect neighbouring lots. Poor waterproofing is one of the most expensive mistakes to fix later, especially in strata buildings.
Wet areas must be waterproofed to AS 3740: bathrooms, showers, laundries, and other internal wet areas require compliant membrane systems and correct detailing. This is licensed trade work in NSW — not something a handyman can sign off on.
A plumber may install floor wastes, drains, or pipework that interact with waterproofed areas. Coordination is essential to avoid disrupting waterproof membranes after installation. The sequencing matters: plumbing rough-in first, waterproofing after, tiling last.
What about a laundry tub?
If you want a laundry tub as well as a washing machine, you’ll need both a cold water connection and a hot water connection to the tub, plus a separate drain. That’s a bigger scope, but it’s straightforward for a licensed plumber — it just adds to the job time and materials.
Where can you actually put a laundry in an apartment?
Location is the most constrained part of the whole job. In a house, you have options. In an apartment, you’re largely working around the drainage stack and the existing pipe runs. A new laundry almost always needs to go:
- Adjacent to, or directly above, an existing drainage stack
- Close to an existing water supply pipe
- In a space with enough floor area to comply with minimum clearances
- In a location that doesn’t require cutting through structural elements without engineering sign-off
Common locations in Sydney apartments include a dedicated laundry cupboard (often near the bathroom), the kitchen area, or a hallway cupboard that sits on the correct side of the building. Some apartments integrate the laundry into the kitchen area. While practical, these setups demand careful planning around noise, drainage, and appliance placement.
The honest answer is: get a plumber to assess the feasibility of your preferred location before you get attached to it. The drainage stack position often makes the decision for you.
What you can’t do yourself in NSW
All of the plumbing work described above is licensed work in NSW. In NSW, you need the right licence or certificate to do plumbing, draining, or gasfitting work. That means the supply connection, the drain connection, the floor waste installation, and the compliance certificate at the end — all of it needs a licensed plumber.
Waterproofing is separate licensed trade work. You must have a licence or certificate to do waterproofing work. Don’t let a general handyman do this step to save money. If the waterproofing fails and there’s no compliant installation behind it, you’re looking at damage to your apartment, the apartment below, and a strata dispute that’s entirely your liability.
When the plumbing work is complete, the plumber issues a Certificate of Compliance for the plumbing and drainage work. Keep this document — your strata scheme will likely want a copy, and you’ll need it if you ever sell.
The order that keeps the job on track
Getting the sequence right saves you from wasted quotes, aborted work, and strata disputes. Here’s the order that works:
- Check your building’s by-laws — before anything else. Some buildings have restrictions that make certain locations impossible regardless of what a plumber says is feasible.
- Get a plumber to assess feasibility — before you submit to strata. You want to know the proposed location actually works from a drainage and supply standpoint before you put it in writing to the owners corporation.
- Submit your strata application — with the full scope, trade licence details, and waterproofing plan.
- Wait for written approval — don’t book trades until you have it in writing.
- Plumbing rough-in — supply lines and drain connections go in first.
- Waterproofing — applied after rough-in, before any tiling.
- Fit-off — taps, tub, washing machine connections, and final inspection.
- Certificate of Compliance — issued by the licensed plumber. Keep it.
A note on older apartment buildings
Sydney has a lot of apartment buildings from the 1960s, 70s, and 80s. If yours is one of them, expect a few extra complications. Cast iron or early PVC drainage stacks may not accept modern branch connections as cleanly as newer buildings. Supply pipes may be undersized or corroding. And the strata plan itself may be less detailed about what’s common property versus lot property when it comes to pipe runs inside walls.
None of this makes adding a laundry impossible — it just means the plumber needs to assess carefully before quoting, and the strata application may need a bit more detail to satisfy the owners corporation.
If you’re dealing with a laundry renovation in an existing space rather than adding one from scratch, the planning considerations are a bit different. The post on laundry renovation plumbing planning covers that side of the job in more detail.
What to sort before you call a plumber
You don’t need to have everything figured out before picking up the phone. But having a few things ready makes the first conversation much more useful:
- Your preferred location for the laundry, and why you’ve chosen it
- The floor plan of your apartment, or at least a rough sketch showing where the bathroom and kitchen are relative to the proposed space
- Your strata manager’s contact details (the plumber may want to know the building type and approximate age)
- Whether you want a tub and tap, or just a washing machine connection
- Whether you’re working to a strata-imposed deadline for approvals
From there, a licensed plumber can give you a realistic view of feasibility, a scope for the strata application, and a fixed price for the work once approval comes through.
Ready to work out if it’s feasible?
If you’re in a Sydney apartment and want to add a laundry, the first step is a site assessment — not a quote. Call Jasco Plumbing and we’ll take a look at the location, the drainage options, and what the strata application scope needs to include. NSW licence #488187C, $20M insurance, fixed pricing before any work starts.